Estimate how much concrete you need for posts, footings, steps, and pads. Learn bag yields, ready-mix delivery thresholds, and ordering guidelines.
Whether you are setting fence posts, pouring deck piers, forming concrete steps, or laying a utility pad, determining how much concrete you need is the first critical step. Ordering too little halts your project midway, while buying far too much wastes money and leaves you with heavy, perishable excess. Here is how to estimate your project volume, choose between bags and a ready-mix truck, and calculate exact bag yields.
Different construction elements require different geometric formulas to calculate raw volume:
One of the most important practical decisions is whether to hand-mix bagged concrete or order a commercial ready-mix concrete truck delivery:
Pre-mixed concrete bags combine Portland cement, sand, and gravel. Because dry bags expand with water during mixing, use these standard yields:
| Bag Size | Volume Yield | Bags per Cubic Yard (yd³) | Bags per Cubic Meter (m³) |
|---|---|---|---|
| 80 lb (36.3 kg) | 0.60 cu ft (0.017 m³) | 45 bags | ~59 bags |
| 60 lb (27.2 kg) | 0.45 cu ft (0.013 m³) | 60 bags | ~78 bags |
| 35 kg (metric) | 0.016 m³ (0.57 cu ft) | ~47 bags | 63 bags |
| 25 kg (metric) | 0.0115 m³ (0.41 cu ft) | ~66 bags | 87 bags |
Always add a 10% contingency allowance to your final order. Uncompacted base gravel, uneven excavation depths, spillage during wheelbarrow transit, and minor form bulging will always consume more concrete than mathematical drawings suggest.
If ordering ready-mix, have a secondary small project ready—such as an extra post hole, stepping stone forms, or a trash can pad—so any slight truck surplus can be put to good use rather than washed out onto the ground.